Tilney Court
- Buckhurst Hill
The proposed development includes the extension of the existing building to create additional dwellings and the external changes to the gardens and access roads.
Slide Heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here
Previous slide
Next slide
The drainage calculations demonstrated that
‐ The post-development runoff volumes have been reduced to the pre-development runoff values by infiltrating all the runoff produced by the development.
‐ No flooding occurs for the 1 in 30 storm events.
‐ Any flooding for the 1 in 100 years +40% climate change event can be safely contained on site.