St Marys Road
- Hastings
Construction of a new 5 level building on a steep slope. The main challenge is the high water table and crossing of multiple critical drainage systems.
Slide Heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here
Previous slide
Next slide
The proposed drainage system included underground tanks and an agreement with the council and the local water company in order to get the planning application approved.