Blog

flood risk map york
Blog

Flood Risk Map

Explore our flood risk map tool with the latest government flood information. Find your flood risk, check if a placed was flooded and more…

Read More »

Sequential Test – District

Sequential Test City District - Urban Water

Our Benefits:

  • Immediate communication with council to determine study area
  • Report in accordance with the local guidelines
  • Assess multiple resources of planning information as per agreed with the council
  • Give preliminary advice on potential sites
  • Recommend appropriate site for assessment
  • Allows for one set of consolidated comments/amendments following the first issue of the report 

What we need from you:

  • Site Address
  • Development Plans
  • Local Planner Contact Details

Single House

Sustainable Drainage Systems Single House

Key Benefits:

  • Design compliant with Building Regs and local water company
  • Scope of site investigations
  • Capacity Assessments from Water Companies
  • Undertake Detailed Hydraulic Modelling
  • Clear Planning Conditions
  • Produce Construction Drawings
  • Providing drawings in .pdf

What we need from you:

  • Site address
  • Site Layout
  • Topographical survey

Minor Development

Flood Risk Assessment Single House

Key Benefits:

  • First draft in 48 hours with the final report in 20 days (dependent on ea information)
  • Report in accordance with the environment agency and with national policy planning framework
  • Allows for one set of consolidated comments/amendments following the first issue of the report

What we need from you:

  • Site address
  • Development plans
  • Topographical ground levels

Major Development

Flood-Risk-assessment-Major-Development

Key Benefits:

  • First draft in 48 hours with the final report in 20 days (dependent on ea information)
  • Report in accordance with the environment agency and with national policy planning framework
  • Allows for one set of consolidated comments/amendments following the first issue of the report

What we need from you:

  • Site address
  • Development plans
  • Topographical ground levels

Strategic Development

Flood Risk Assessment Strategic Development

Key Benefits:

  • First draft in 48 hours with the final report in 20 days (dependent on ea information)
  • Report in accordance with the environment agency and with national policy planning framework
  • Allows for one set of consolidated comments/amendments following the first issue of the report

What we need from you:

  • Site address
  • Development plans
  • Topographical ground levels

Single House

Drainage Strategy Single House

Key Benefits:

  • The drainage strategy will inform the flood risk assessment
  • Assessment of available geological records or site investigation if available
  • Obtain and review sewer plans
  • Evaluate potential use of suds applicable to site
  • Determine climate change allowances
  • Undertake basic hydraulic modelling of foul and surface water
  • Calculate storage volumes to comply with suds guidance
  • Indicate discharge points and rates for foul water
  • Indicate applicable suds and volume distribution at a principle level
  • Provide single sketch concept of the drainage strategy
  • Allows for one set of consolidated comments / amendments following first issue of report

What we need from you:

  • Site address
  • Site Layout
  • Topographical survey

Minor Development

Drainage Strategy Minor Development

Key Benefits:

  • The drainage strategy will inform the flood risk assessment
  • Assessment of available geological records or site investigation if available
  • Obtain and review sewer plans
  • Evaluate potential use of suds applicable to site
  • Determine climate change allowances
  • Undertake basic hydraulic modelling of foul and surface water
  • Calculate storage volumes to comply with suds guidance
  • Indicate discharge points and rates for foul water
  • Indicate applicable suds and volume distribution at a principle level
  • Provide single sketch concept of the drainage strategy
  • Allows for one set of consolidated comments / amendments following first issue of report

What we need from you:

  • Site address
  • Site Layout
  • Topographical survey

Major Development

Drainage Strategy Major Development

Key Benefits:

  • The drainage strategy will inform the flood risk assessment
  • Assessment of available geological records or site investigation if available
  • Obtain and review sewer plans
  • Evaluate potential use of suds applicable to site
  • Determine climate change allowances
  • Undertake basic hydraulic modelling of foul and surface water
  • Calculate storage volumes to comply with suds guidance
  • Indicate discharge points and rates for foul water
  • Indicate applicable suds and volume distribution at a principle level
  • Provide single sketch concept of the drainage strategy
  • Allows for one set of consolidated comments / amendments following first issue of report

What we need from you:

  • Site address
  • Site Layout
  • Topographical survey

Single House

Foul Drainage Design Single House

Key Benefits:

  • Design compliant with Building Regs and local water company
  • Scope of site investigations
  • Capacity Assessments from Water Companies
  • Undertake Hydraulic Modelling
  • Treatment Plant Sizing
  • Drainage Field Calculations
  • Providing design in .pdf
  • Clear Planning Conditions
  • Produce Construction Drawings

What we need from you:

  • Site address
  • Site Layout
  • Topographical survey

Major Development

Foul Drainage Design Major Development

Key Benefits:

  • Design compliant with Building Regs and local water company
  • Scope of site investigations
  • Capacity Assessments from Water Companies
  • Undertake Hydraulic Modelling
  • Pumping Station Calculations
  • Rising Main Design
  • Provide design in .pdf and .dwg
  • Clear Planning Conditions
  • Produce Construction Drawings

What we need from you:

  • Site address
  • Site Layout
  • Topographical survey

Minor Development

Foul Drainage Design Minor Development

Key Benefits:

  • Design compliant with Building Regs and local water company
  • Scope of site investigations
  • Capacity Assessments from Water Companies
  • Undertake Hydraulic Modelling
  • Pumping Station Calculations
  • Rising Main Design
  • Providing design in .pdf and .dwg
  • Clear Planning Conditions
  • Produce Construction Drawings

What we need from you:

  • Site address
  • Site Layout
  • Topographical survey

Minor Development

Sustainable Drainage Minor Development

Key Benefits:

  • Design compliant with Building Regs and local water company
  • Scope of site investigations
  • Capacity Assessments from Water Companies
  • Undertake Detailed Hydraulic Modelling
  • Clear Planning Conditions
  • Produce Construction Drawings
  • Providing drawings in .pdf and .dwg

What we need from you:

  • Site address
  • Site Layout
  • Topographical survey

Sequential Test – City

Sequential Test City Borough - Urban Water

Our Benefits:

  • Immediate communication with council to determine study area
  • Report in accordance with the local guidelines
  • Assess multiple resources of planning information as per agreed with the council
  • Give preliminary advice on potential sites
  • Recommend appropriate site for assessment
  • Allows for one set of consolidated comments/amendments following the first issue of the report 

What we need from you:

  • Site Address
  • Development Plans
  • Local Planner Contact Details

Major Development

Sustainable Drainage Major Development

Key Benefits:

  • Design compliant with Building Regs and local water company
  • Scope of site investigations
  • Capacity Assessments from Water Companies
  • Undertake Detailed Hydraulic Modelling
  • Clear Planning Conditions
  • Produce Construction Drawings
  • Providing drawings in .pdf and .dwg

What we need from you:

  • Site address
  • Site Layout
  • Topographical survey

Zero Carbon Design

Zero Carbon - Climate Change Adaptation

Key Benefits:

  • Complete Cycle Assessment
  • Early Design Optimization
  • Embodied Carbon Calculation
  • Circularity Assessment
  • Carbon Benchmarking
  • Our calculations are based on the LCA standards (CEN/TC350, ISO 218930)
  • It follows the RICS building stages
  • All CO2 values taken from the verified EPD database
  • Compliant with BREEAM UK and CEEQUAL Standards

What we need from you:

  • External Work Layout
  • Initial Drainage Design
  • Site Layouts

Zero Carbon Design

Nature-Based-min.jpg

Key Benefits:

  • Tackle Climate and Nature Crises in Master Planning
  • Example of Using Nature-Based Solutions around the world
  • Utilize the Government’s Research to identify area in which Local and Regional Nature-Based Solutions can be implemented.

Urban Areas

Hydraulic River Modelling - Urban Water

Our Benefits:

  • Models fully approved by the Environment Agency
  • Obtain LIDAR data
  • Produce Hydrological and hydraulic assessment
  • Model Climate Change
  • Site Visit
  • Scope Topographical and measurement survey

What we need from you:

  • Site Location Plans
  • Topographical survey of the site
  • All correspondence with the Environment Agency

Rural Areas

Hydraulic Modelling of River Flow

Our Benefits:

  • Models fully approved by the Environment Agency
  • Obtain LIDAR data
  • Produce Hydrological and hydraulic assessment
  • Model Climate Change
  • Site Visit
  • Scope Topographical and measurement survey

What we need from you:

  • Site Location Plans
  • Topographical survey of the site
  • All correspondence with the Environment Agency

Exception Registration

Flood Risk Activity Permit Exception Application - Urban Water

Our Benefits:

  • Fast assessment on the required exception application
  • Follow up on the Environment Agency
  • Review of your design
  • Review of the contractor’s method statement
  • Assess  the environmental risk for the site

What we need from you:

  • All detailed drawings
  • RAMS
  • Flood Risk Assessment
  • Construction Phase Plan

Standard Rules Permit

Flood Risk Activity Permit Standard Application - Urban Water

Our Benefits:

  • Fast assessment on the required exception application
  • Follow up on the Environment Agency
  • Review of your design
  • Review of the contractor’s method statement
  • Assess  the environmental risk for the site

What we need from you:

  • All detailed drawings
  • RAMS
  • Flood Risk Assessment
  • Construction Phase Plan

Bespoke Permit

Flood Risk Activity Permit Bespoke Application - Urban Water

Our Benefits:

  • Fast assessment on the required exception application
  • Follow up on the Environment Agency
  • Review of your design
  • Review of the contractor’s method statement
  • Assess  the environmental risk for the site

What we need from you:

  • All detailed drawings
  • RAMS
  • Flood Risk Assessment
  • Construction Phase Plan

Sequential Test – Village

Sequential Test Village- Urban Water

Our Benefits:

  • Immediate communication with council to determine study area
  • Report in accordance with the local guidelines
  • Assess multiple resources of planning information as per agreed with the council
  • Give preliminary advice on potential sites
  • Recommend appropriate site for assessment
  • Allows for one set of consolidated comments/amendments following the first issue of the report 

What we need from you:

  • Site Address
  • Development Plans
  • Local Planner Contact Details

Sequential Test – Town

Sequential Test Town - Urban Water

Our Benefits:

  • Immediate communication with council to determine study area
  • Report in accordance with the local guidelines
  • Assess multiple resources of planning information as per agreed with the council
  • Give preliminary advice on potential sites
  • Recommend appropriate site for assessment
  • Allows for one set of consolidated comments/amendments following the first issue of the report 

What we need from you:

  • Site Address
  • Development Plans
  • Local Planner Contact Details

Extensions

Flood Risk Assessment Single House

Key Benefits:

  • First draft in 48 hours with the final report in 20 days (dependent on ea information)
  • Report in accordance with the environment agency and with national policy planning framework
  • Allows for one set of consolidated comments/amendments following the first issue of the report

What we need from you:

  • Site address
  • Development plans
  • Topographical ground levels